Skip to content
Get started
Industry edition · Manufacturing

Manufacturing operations where every quality hold has an owner — on the line and with your suppliers

Mi Retail is the operations center for manufacturers: every quality deviation, batch hold, corrective action and claim to a raw-material supplier becomes a work item with an owner, a state and evidence. Your MES and ERP keep the production record; Mi Retail keeps the people who must resolve it moving.

A quality technician in safety glasses examines a sample part with a line supervisor next to a finished batch on a pallet in a bright factory.
The problem

Why do quality deviations stall between the line, the quality team and suppliers?

Quality deviations stall because the systems record the defect but nobody owns what has to happen next: the MES marks the batch on hold, the lab has the test result, the line needs a corrective action and the supplier needs a claim. Each part moves in a different channel, so the batch sits in the warehouse while people ask each other where it stands.

  • The hold lives on a tag

    A red tag on the pallets and a line in a spreadsheet are the only proof that a batch is quarantined, and why.

  • Corrective actions end at the meeting

    The quality review agrees on a fix for the line, but nobody follows it until the same defect shows up again.

  • Supplier claims disappear into email

    The claim to the raw-material supplier goes out as an email with attachments, and the plant waits for an answer nobody is tracking.

Where the work falls through

How do manufacturers handle quality holds today?

Most plants run an ERP for materials and orders, often with an MES or a quality module on the floor, and handle everything between departments and suppliers through email, meetings and spreadsheets.

Specialized software

What it does well

Bills of materials, routings, production orders, lot genealogy and inventory status are precise and traceable.

Where the work leaves it

The system can flag a batch as held, but the review, the fix on the line and the claim to the supplier leave it and continue in meetings, email and spreadsheets.

Manufacturing ERP and execution systems (MES) — e.g. SAP S/4HANA, Siemens Opcenter, Epicor Kinetic1

Indie and AI-built apps

What it does well

A quick nonconformance form or a CAPA tracker built in days gives the quality team a place to start.

Where the work leaves it

It stays inside the quality team, knows nothing about the line or the supplier, and cannot send work to another company. It usually depends on whoever built it.

No system at all

What it does well

Red tags, a whiteboard by the line and a shared spreadsheet are visible and everyone understands them.

Where the work leaves it

Nobody owns the hold, corrective actions are forgotten after the shift, and when a customer asks for the history of a batch it has to be rebuilt by hand.

Keep your MES and ERP. Mi Retail takes over where the work leaves it: between the line, quality, plant management and your suppliers.

Start free
How the work moves

How does a plant resolve a quality hold with its raw-material supplier?

A molded batch fails a tensile test. Here is how the hold moves through Mi Retail — from the lab to the line, to the resin supplier and back — with the state of each work item on Tuesday at noon.

Step by step

  1. Quality assurance Completed

    Batch B-2418 · tensile below spec

    The lab records that batch B-2418 fails its tensile test, so quality opens a deviation work item that will hold the whole case until the batch is released or scrapped.

  2. Production · Line 3 Completed

    Hold batch B-2418 · 36 pallets

    Line 3 places the batch on hold in the MES and tags the pallets in the warehouse, and the work item closes with the location of every pallet.

  3. Quality assurance Completed

    MRB review · disposition

    The material review board traces the defect to resin lot 7731, keeps the batch on hold and records its reasoning in the same work item.

  4. Production · Line 3 In progress

    Corrective action · resin drying

    Line 3 adjusts the dryer settings and adds a moisture check at loading, and the corrective action stays open until three consecutive batches pass.

  5. Keystone Resins · Customer quality In progress

    Quality claim · resin lot 7731

    A derived work item lands in Keystone Resins’ own Mi Retail with the test report and lot number, where their customer quality team takes ownership of the claim.

  6. Keystone Resins · Customer quality New

    Send 8D analysis · lot 7731

    Keystone Resins answers with its root-cause analysis and the certificate of analysis for the replacement lot, and the plant sees it the moment the derived work item closes.

  7. Plant manager New

    Release decision · batch B-2418

    With the supplier’s analysis and the retest in front of them, the plant manager approves releasing, reworking or scrapping the batch, and the hold closes with its full trail.

One work item, two organizations

Who asked Ardent Polymers · My Requests
Who does it Keystone Resins · My Work

A derived work item lands in Keystone Resins’ own Mi Retail with the test report and lot number, where their customer quality team takes ownership of the claim.

What changes for the plant

  • Every held batch has an owner, a state and a next action, not just a red tag.
  • Corrective actions stay open until they prove they work, instead of ending at the meeting.
  • Claims to suppliers move as derived work items both sides can follow to a documented answer.
  • When a customer asks about a batch, its whole history is already attached.

Apps involved

Docs Drive Sheets Chat Calendar
  • Quality Management In StoneOS
  • Batch Traceability In StoneOS
  • Shop Floor In StoneOS
  • Production Orders In StoneOS
  • Production Planning In StoneOS
  • Yield & Waste In StoneOS
  • The MES or ERP you already use Keep your current system

Frequently asked questions: Manufacturing

What is Mi Retail for manufacturers?

Mi Retail is an operations center for manufacturing plants. It does not plan production or record lot genealogy; it manages the human work that appears around those records. A quality deviation, a batch on hold, a corrective action on a line, a breakdown that needs maintenance or a claim to a supplier becomes an Operational Work Item with an owner, a state, a due date and evidence. Each person sees the part that is theirs: operators see their line, quality sees batches waiting for a disposition, maintenance sees its open incidents and the plant manager only the decisions that need them. The domain work — BOMs, routings, production orders, quality records — runs in StoneOS apps or in the systems you already use.

Does Mi Retail replace my MES or ERP?

No. Your ERP stays the system of record for materials, orders and costs, and your MES keeps production status, lot genealogy and hold flags. Mi Retail never keeps a second copy of that data. What it adds is the layer those systems were not built for: coordinating the people who must act when a record has a problem. The MES can tell you a batch is on hold; Mi Retail manages who reviews it, which corrective action the line owes, what the supplier has to answer, what is blocking the release and with which evidence the case closes. Keep your MES and ERP; Mi Retail takes over where the work leaves them.

How does Mi Retail handle a batch that fails a quality check?

When the lab records a result out of specification, quality opens a deviation work item that holds the whole case. The line places the batch on hold in the MES and closes its part with the location of the pallets. The material review board decides the disposition and records its reasoning in the same work item. If the cause points to the line, a corrective action is assigned with a due date; if it points to a raw material, a claim goes to the supplier as a derived work item. When the supplier answers and the retest passes, the plant manager approves the release, rework or scrap decision, and the hold closes with its evidence attached.

Do raw-material suppliers need to use Mi Retail to receive a quality claim?

Yes. Work between organizations moves as derived work items, so both the plant and its supplier need their own organization on Mi Retail. The plant picks the supplier from the directory and sends the claim with the lot number, the test report and the deadline; the supplier receives it in its own intake queue and assigns it inside its own teams. Each side keeps its privacy: the plant follows the state, due date and answer, but not the supplier’s internal investigation or conversations. When the supplier closes the derived work item with its root-cause analysis, the plant is notified and can move to the release decision. Claims stop depending on email threads nobody tracks.

How does Mi Retail follow corrective actions (CAPA) until they actually work?

A corrective action agreed in a quality review becomes a follow-up work item with an owner on the line, a due date and a clear closing condition, such as three consecutive batches passing inspection. It stays linked to the deviation that caused it, so anyone can see why it exists. The owner marks it in progress, attaches the new settings or the updated work instruction, and can block it with a reason if a part or a validation is missing. Quality reviews the evidence before it closes. If the same defect returns, the new deviation links to the earlier action, and the pattern becomes visible instead of being rediscovered at the next audit.

How do production, maintenance and quality coordinate on the shop floor with Mi Retail?

Each team keeps its own queue, but the work that crosses between them travels as linked work items. A stoppage on a work center becomes an incident assigned to maintenance, linked to the production order it is delaying. Maintenance sees it ordered by priority, marks it in progress and blocks it with a reason if a spare part is missing. The line supervisor sees the state without walking over to ask, and planning can re-sequence orders when a repair runs late. When quality needs a first-article check after the repair, it receives its own work item. Nobody has to chase anybody on the radio to know whether the line can restart.

What does a plant manager or operations director see in Mi Retail?

The plant manager does not need to review every deviation. Operational Portfolio shows how each line and each area is doing: batches on hold, corrective actions overdue, incidents blocking production and supplier claims without an answer. Executive Operations shows only what needs a decision at that level — a costly scrap decision, a defect that keeps returning on the same product, a supplier that repeatedly misses its response dates. In a company with several plants, the same view compares sites side by side. Operators, meanwhile, work from My Work and Today with only what is theirs. Each role sees the same operation from its own surface, with the context of each case already attached.

How does Mi Retail keep evidence for customer audits and batch traceability?

Every work item keeps who acted, when, under which decision and with which attachments. When a customer audits a shipment or asks about a specific batch, the plant can show the full trail: the test report, the hold, the review board’s reasoning, the corrective action with its proof of effectiveness, the supplier’s analysis and the release decision. The lot genealogy itself stays in your traceability system; Mi Retail keeps the record of the human decisions around it. Control & Assurance lets an internal auditor or a customer quality team review those trails without asking anyone for screenshots, because the evidence was captured while the work happened.

Does Mi Retail work for a small workshop as well as a multi-plant manufacturer?

Yes, it is the same product at both ends. In a workshop where a handful of people run production, quality and purchasing, the experience collapses to the essentials: one Today view with what is on hold, what is waiting on a supplier and what must be solved before the next order ships, without fake hierarchies or empty teams. In a manufacturer with several plants and hundreds of people, the same work items are distributed across lines, quality, maintenance, planning and plant management, each with its own surface, and exceptions escalate to the right level. What changes is how responsibilities are split, not the way the work is represented.

Can contract manufacturers and brand owners work together on Mi Retail?

Yes. Contract manufacturing lives on handoffs between companies: the brand owner requests a production run, approves an artwork or a specification change, and needs answers when a batch deviates. In Mi Retail, each of those requests is a derived work item that lands in the contract manufacturer’s own intake, is assigned inside its teams and returns with the requested evidence, such as a first-article report or a sample approval. The brand owner follows the state and the result without seeing the manufacturer’s internal work, and the manufacturer serves several brands without mixing their information. The same pattern works for toll processing, subcontracted machining or outsourced packaging.

Which StoneOS apps come with the Manufacturing edition?

The Manufacturing edition of StoneOS brings apps for the domain work of a plant — product engineering, bills of materials, routings, work centers, MRP, production planning, production orders, shop floor, capacity planning, manufacturing costing, quality management, batch traceability and yield and waste — on top of the Business Core apps every team uses: Chat, Docs, Drive, Calendar, People, Notes, Sheets, Slides and To-do. Those apps keep the depth of each domain. Mi Retail is where the work they generate meets the people who must move it: a failed inspection, a capacity conflict or a yield drop lands as a work item in the right person’s queue. If you keep your current MES or ERP, it stays the record.

How does a manufacturing plant get started with Mi Retail?

Start with one process that keeps slipping — quality holds, supplier claims or maintenance stoppages — instead of modeling the whole plant. Create the workspace for that area, invite the people involved and let the first deviations arrive as work items with an owner and a due date. Within a few weeks you will see where batches wait and who carries the load. Then add the next line or area, invite your key suppliers to receive claims through Mi Retail, connect the systems you already use and, when it makes sense, bring in the Manufacturing edition apps from StoneOS. Mi Retail is free to start, so a single line can try it before rolling it out to every plant.

Put the work in motion with Mi Retail

Start free with your team, bring in the systems you already use, and give every request an owner, a state and a result.

With StoneOS

Run the plant’s domain work on StoneOS

Bills of materials, MRP, production orders and quality run in StoneOS Manufacturing. Mi Retail moves the work between people.